
FSSC 22000
A food safety system certificate for the named DADI entity, shown valid through September 17, 2027. It supports food-packaging supplier review; product suitability still depends on the pack and process.
Custom printed tins for ambitious brands
From first drawing to repeat production, DADI turns printed tin into a shelf-ready brand asset.
Founded in 1995, DADI develops and manufactures custom printed tin packaging in Guangdong, China.
About DADI
Founded in 1995, DADI develops and manufactures custom printed tin packaging in Guangdong, China. We bring structure, printing, tooling and production together for food, gift, seasonal and edible-oil programs, then carry approved designs into repeat production for markets worldwide.
Start with the packed product and the buying model. Shape, decoration and production planning follow from there.
Decorative tins for launches, licensed programs and gift sets, with round, rectangular and custom-shape routes.
Formats for cookies, candy, tea, spices and other dry foods. Food-contact claims stay tied to the selected coating and test scope.
Rectangular, round and cylindrical cans with structure selection based on fill, closure and handling needs.
A broader format library for distributors and co-packers managing several SKUs or customer programs.
| Tinplate | 0.19 to 0.40 mm |
|---|---|
| Formats | Round, square, rectangular, handled and custom shapes |
| Surface and print effects | Dark pattern, tactile non-slip, burst texture, pearl dot, matte, wrinkle, laser, 3D and laser anti-counterfeit label effects |
| Print equipment | Two imported Japanese two-color presses, one UV four-color press and two coating lines |
| Production environment | Class 300,000 cleanroom and multi-functional laboratory |
| Typical timing | Sample about 7 days; new mold about 25 days; mass production 20 to 30 days |
| Commercial terms | 30% deposit and 70% balance, subject to quotation and contract |
From brief to repeat production
A clear route from brief to shipment, with timing confirmed against the approved project.
Confirm the packed product, target format, graphics, quantity and launch window.
Review structure and artwork, then prepare a physical sample. Typical sample timing is about 7 days.
Confirm the mold route, print process and production controls. A new mold typically takes about 25 days.
Print, form, assemble and inspect against the approved specification.
Mass production is typically 20 to 30 days. Final timing depends on the approved project.
Manufacturing proof
System certificates support supplier review. Product suitability still depends on the selected pack, coating, process and test scope.

A food safety system certificate for the named DADI entity, shown valid through September 17, 2027. It supports food-packaging supplier review; product suitability still depends on the pack and process.

A quality management system certificate shown valid through January 23, 2028. It supports review of documented quality controls, not a claim that every product is certified.

A measurement management system certificate shown valid through March 22, 2027. It relates to measurement controls used in production and inspection.
Follow the material through forming, printing, inspection and packing.
Process video link pending confirmation
Watch the process videoShare the product, target format, quantity and launch window. Tell us what the pack needs to do.
All fields are required.